![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
Sections:
Divers:
|
Mandate· Technical specifications, procurement and industrial follow-up, of the main dipole cold masses, with the technical responsibility for the conformance to design and acceptability of the cold masses. · If needed, introduce the necessary technical modifications in the dipole cold mass generated by the structural design follow-up. · Validate (together with MA section) the dipole cold masses and ensure their timely delivery to CERN. · Control the cost of the construction of the main dipoles, by proper monitoring of extra works and CERN contribution, and take all actions to stay in the allocated budget. · Provide all data for MTF and database on main dipoles, and using the tools provided by LO, ensure the proper traceability of all Non Conformities and Change Notices.
|
||||
![]() |
Server e-maill - January 2003 V. Remondno |